Homepage | Home | Bookmarke
Member

Tianjin Zhengda General Steel Pipe Technology Co.,Ltd


Products
  • No Category
Search
 

Friends links
  • No link
You are here: Home » Products » ERW Scaffolding Steel Pipe For Building And Construction
ERW Scaffolding Steel Pipe For Building And Construction
Click image to view full size image
Product: Views:499ERW Scaffolding Steel Pipe For Building And Construction 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-11-26 07:44
  Inquiry
Details

ERW Scaffolding Steel Pipe for Building and Construction



Description                                                                                                    





scaffolding tube 

Size:

OD

48.3mm;60.3mm



Wall Thickness

2.75mm~4.0mm


Steel material

Q235 → Grade D,SS400,S235JR,S235JO,S235J2

Q345 → SS500,ST52

Standard

BS EN10296,BS EN10025,BS EN10297,BS6323, BSEN10217,GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88

BS1387/1985,ASTM A53/A36,EN39/EN10219,API 5L,GB/T9711.1-99 etc

Ends

1) Plain ,

2) Beveled

3) Thread with Coupling or cap

Surface Treatment

 hot dip Galvanized,black, painted

Section shape

Round

Package

1.Big OD:in bulk

2.Small OD:packed by steel strips

3.woven cloth with 7 slats,

4.plastic bags

5.as per customer's option

Application

1)low pressure liquid delivery such as water,gas and oil

2)construction

3)fence and door pipe

Loading port

Xingang port, Tianjin, China

Delivery time

10-20 days or upon negotiation




Product Photo                                                                                                  













Inquiry